Projects
Commercial Construction
Recycled Aggregate Products Las Vegas Street Facility
Clients: Recycled Aggregate Products, Inc.
Location: Colorado Springs, CO
Scope:
Modifications to existing industrial processing site: Prepared a grading design, water quality plan and permanent erosion control plan for the existing industrial facility involved in receiving salvaged aggregate materials and processing for material for resale.
613 County Line Road Office Warehouses
Clients: Foxtrot, LLC
Location: Palmer Lake, CO
Scope:
New office/warehouse facility in two phases: Prepare drainage design and report, prepare grading and erosion control plan with stormwater quality and storm detention plans, prepare utility plans for the site. Aid in Development Plan submission and approval.
Pierce Subdivision Office/Warehouse Development
Clients: Pierce Properties, Inc.
Location: Colorado Springs, CO
Scope:
New commercial / Industrial subdivision 8 lots and street right-of-way. Prepare topographic survey and final plat. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare public street and utility main plan and profile drawings, prepare final site and grading and erosion control plans for individual lots with storm water quality and storm detention facilities, prepare plans for utility services to the buildings, submit the plans to City of Colorado Springs departments and coordinating for review and approval of the plans.
712 Clark Place
Office/Warehouse Development
Clients: Pierce Properties, Inc.
Location: Colorado Springs, CO
Scope:
New Office / Warehouse site: Prepare topographic survey of site. Prepare Site Development Plan for City submission and approval. Prepare Final Drainage Report, Prepare street and utility main plan and profile drawings, prepare final site and grading and erosion control plans for individual lots with storm water quality and storm detention facilities, prepare plans for utility services to the buildings, submit the plans to City of Colorado Springs departments and coordinating for review and approval of the plans.
Sproul Rail Industrial Park Filing No. 8
Clients: Epic Commercial Properties, LLC
Location: Colorado Springs, CO
Scope:
New Office / Warehouse Development: Prepare topographic survey of site and development concept with 8 commercial lots, prepare topography survey, prepare public street construction plans, prepare Site Development Plans for one of the lot with grading and erosion control plans and utility service plans for the 19,200 sf office/warehouse building, submit all plans to City departments and coordinate for plan approvals.
Church Construction & Additions
Radiant Church North Campus
Clients: Radiant Church Assembly of God
Location: Colorado Springs, CO
Scope:
Site topographic survey for project involving a major addition to church building and site improvements with Development Plan and subdivision plat entitlements. Provide Civil Engineering drawings and conducted Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage and utility plans.
First Evangelical Free Church of Colorado Springs
Clients: First Evangelical Free Church of Colorado Springs
Location: Palmer Lake, CO
Scope:
Site topographic survey for project involving a new church building and site improvements with Development Plan and subdivision plat entitlements. Provide Civil Engineering drawings and conducted Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage and utility plans.
Sacred Heart Catholic Church
Clients: Taylor Architecture and Design
Location: Colorado Springs, CO
Scope:
Addition to church building and site reconfiguration for the city block on which the church sits. Prepare topographic survey and final plat. Provide Civil Engineering drawings and aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage and utilities.
St. Francis of Assisi Catholic Church
Clients: Eidos Architects, PC
Location: Douglas County, CO
Scope:
Addition to church parking lot and drainage facilities. Prepare topographic survey and grading plans with storm detention and water quality treatment facilities. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control and drainage.
Academy Christian Church
Clients: Bollar Cruz Architect and Academy Christian Church
Location: Colorado Springs, CO
Scope:
Addition to church building and site reconfiguration. Prepare topographic survey and final plat. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage and utilities. Obtain closure of Drainage Basin for elimination of drainage fees through City/County Drainage Board. In later phase. preparing plans for Parking Lot Addition and obtaining City approval of the construction drawings.
New Hope Presbyterian Church
Clients: New Hope Presbyterian Church
Location: Castle Rock, CO
Scope:
Addition to church building and site reconfiguration. Prepare topographic survey, ALTA survey and final plat. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage, utilities and adjacent public street.
New Hope Presbyterian Church
Clients:New Hope Presbyterian Church
Location: Castle Rock, CO
Scope:
Addition to church building and site reconfiguration. Prepare topographic survey and final plat. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage and utilities. Obtain closure of Drainage Basin for elimination of drainage fees through City/County Drainage Board. In later phase. preparing plans for Parking Lot Addition and obtaining City approval of the construction drawings.
New Hope Presbyterian Church
Clients: New Hope Presbyterian Church
Location: Castle Rock, CO
Scope:
Addition to church building and site reconfiguration. Prepare topographic survey, ALTA survey and final plat. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control, drainage, utilities and adjacent public street.
Fellowship of the Rockies
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Addition to church building. Prepare topography survey, prepare ALTA survey and final plat, locate utilities for movement, design parking lot re-habilitation.
Immaculate Conception Catholic Church
Clients: Eidos Architects
Location: Lafayette, CO
Scope:
Addition to church building. Survey, topography, prepare ALTA survey and final plat, locate utilities for movement, design parking lot re-rehabilitation.
Ascension Lutheran Church
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Addition to church building. Survey, topography, prepare ALTA survey and final plat, locate utilities for movement, design parking lot rehabilitation.
St. Paul's Catholic Church
Clients: Clifford Taylor & Associates - Architects
Location: Colorado Springs, CO
Scope:
Phase 1 - Add on school & Administration rooms between existing Church & School. Survey topography, locate utilities for movement & extension design, grading design and storm sewer design, parking lot re-habilitation.
Phase 2 - Addition of gym and classrooms to existing school. Survey topography, grading and utility design for new addition and parking.
Holy Cross Abbey
Clients: Holy Cross Abbey
Location: Canon City, CO
Scope:
Annexation and Plat of Abbey property. Prepared ALTA survey and topographic survey of the site. Prepared Annexation plat and subdivision plat of the property.
St. Paul's Catholic Church
Clients: Clifford Taylor & Associates - Architects
Location: Colorado Springs, CO
Scope:
Phase 1 - Add on school & Administration rooms between existing Church & School. Survey topography, locate utilities for movement & extension design, grading design and storm sewer design, parking lot re-habilitation.
Phase 2 - Addition of gym and classrooms to existing school. Survey topography, grading and utility design for new addition and parking.
Our Lady of the Pines Catholic Church
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Phase 1: New Church. Survey topography, storm drainage design, design water main & hydrant addition, and parking lot design & re-habilitation.
Phase 2: Later addition to church paved parking lot. Prepare topographic survey and grading plans. Prepare Final Drainage Report and final design for grading and erosion control Plans.
Phase 3: Later addition to church parking lot and drainage facilities. Prepare topographic survey and grading plans with water quality treatment facilities. Aid in Development Plan submission and approval. Prepare Final Drainage Report, Prepare final design for grading, erosion control and drainage
St. Paul's Catholic Church
Clients: Clifford Taylor & Associates - Architects
Location: Colorado Springs, CO
Scope:
Phase 1 - Add on school & Administration rooms between existing Church & School. Survey topography, locate utilities for movement & extension design, grading design and storm sewer design, parking lot re-habilitation.
Phase 2 - Addition of gym and classrooms to existing school. Survey topography, grading and utility design for new addition and parking.
Monument Community Presbyterian Church
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Addition to existing church. Survey property for platting, topography mapping, locate existing utilities for movement & design, parking lot design with storm sewer detention.
St. Patrick's Catholic Church
Clients: Eidos Architects
Location: Colorado Springs, CO
Scope:
Addition to existing church. Property survey, topography survey, utility locates for extension, overall design & parking lot design.
St. Gabriel The Archangel Catholic Church
Clients: The Catholic Diocese of Colorado Springs
Location: Colorado Springs, CO
Scope:
Property Boundary survey.
Garden Ranch Baptist Church
Clients: Bollar Cruz Architects & Garden Ranch Baptist Church
Location: Colorado Springs, CO
Scope:
Preliminary Grading, Utility and Drainage Design and Drainage Report Preparation for Development Plan Approval for church addition and site improvements. Prepare final construction plans for storm detention and water quality facilities.
Heart of the Springs Church
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Add on addition to church. Survey topography, Grading and Drainage Design and parking lot reconfiguration.
Covenant Presbyterian Church
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Add on addition to church. Survey topography, storm drainage design, design water main & hydrant addition, and parking lot re-habilitation.
Chapel Hills Baptist Church
Clients: Bollar Cruz Architects
Location: Colorado Springs, CO
Scope:
Addition to existing church. Property survey, topography survey, utility locates for extension, and platting services.
Multi-Family Residential Developments
RKG Garden Terrace Apartments
Clients: Taylor Architecture & Design, LLC
Location: Colorado Springs, CO
Scope:
Civil conceptual design for drainage and utility facilities on the site including coordination with city and state agencies regarding access and right-of-way considerations.
Pine Creek Apartments
Clients: Slipstream Development Company, LLC
Location: Colorado Springs, CO
Scope:
Preparing Grading and Erosion Control Plan and Storm Water Management Plan (SWMP) for Pine Creek Apartments Site Renovations. Also prepared the Water Plan for the private water system replacement project.
Townhomes at Jetwing
Clients: J. Elliott Construction LLC
Location: Colorado Springs, CO
Scope:
Completing the initial planning, layout and conceptual design multi-family housing project focused on the lower end of the housing cost spectrum in southeast Colorado Springs, preparing and obtaining approval of the Development Plan and Subdivision Final Plat for the project, preparing the Civil Construction Documents for the site including the Grading and Erosion Control Plan, Permanent Control Measure (Detention Pond) Plan, Storm Drain Plan and Profile Drawings, Public Street Improvement Plan, Water Main Plan, Sanitary Sewer Main Plan & Profile Drawings and the Utility Service Plan for the project.
Bradley Crossroads
Clients: J. Elliott Construction LLC
Location: Colorado Springs, CO
Scope:
Completing the initial planning, layout and conceptual design for the affordable housing project in El Paso County near the southern Colorado Springs, completing the El Paso County Zone Change Zone preparing and obtaining approval of the Development Plan and Subdivision Final Plat for the project, preparing the Civil Construction Documents for the site including the Grading and Erosion Control Plan, Storm Drain Plan and Profile Drawings, Water Main Plan, Sanitary Sewer Main Plan & Profile Drawings and the Utility Service Plan for the project.
Village at Skyline
Clients: National Benevolent Association (NBA)
Location: Colorado Springs, CO
Scope:
Civil design and surveying for the phased retirement oriented development that includes single family residential, multi-family residential, senior apartment housing, assisted living and skilled nurse care facilities. Services included preparation and approvals of topographic surveys, final plats, Final Drainage Report, final designs and plans for grading, erosion control, drainage and utilities as well as aided in Development Plan submission and approval.
Villas at Bear Creek Condominiums
Clients: Paulson Architects, P.C.
Location: Colorado Springs, CO
Scope:
Civil design and surveying for the phased multi-family development (condominiums). Services included preparation and approvals of topographic surveys, final plats, condominium mapping, Final Drainage Report, final designs and plans for grading, erosion control, drainage, utilities, construction staking as well as aided in Development Plan submission and approval.
Victoria Park Condominiums
Clients: SBC Construction & Development, Inc.
Location: Colorado Springs, CO
Scope:
Civil design and surveying for the phased multi-family development (condominiums). Services included preparation and approvals of topographic surveys, final plats, condominium mapping, Final Drainage Report, final designs and plans for grading, erosion control, drainage, utilities, construction staking as well as aided in Development Plan submission and approval.
Mandalay Villas Condominiums
Clients: Paulson Architects, P.C.
Location: Colorado Springs, CO
Scope:
Civil design and surveying for the multi-family development (condominiums). Services included preparation and approvals of topographic surveys, final plats, condominium mapping, Final Drainage Report, final designs and plans for grading, erosion control, drainage, utilities, construction staking as well as aided in Development Plan submission and approval.
Myron Stratton Home Addition and Improvements
Clients: James W. Nakai & Associates
Location: Colorado Springs, CO
Scope:
Civil design for the assisted living and skilled nursing facility located on the Myron Stratton Home grounds. Services included preparation and approvals of topographic surveys, final designs and plans for grading, erosion control, drainage and utilities.
The Belcaro (former NBA Village at the Bluffs)
Clients: St. Louis Design Alliance
Location: Colorado Springs, CO
Scope:
Civil design and surveying for the senior housing multi-family development. Services included preparation and approvals of topographic surveys, final plat, ALTA/ACSM and HUD surveys, Final Drainage Report, final designs and plans for grading, erosion control, drainage, utilities, construction staking as well as preparation and approval of the Development Plan.
NBA Lifestyles
Clients: St. Louis Design Alliance
Location: Colorado Springs, CO
Scope:
Civil design and surveying for the multi-family development. Services included preparation and approvals of topographic surveys, final plat, ALTA/ACSM and HUD surveys, Final Drainage Report, final designs and plans for grading, erosion control, drainage, utilities, construction staking as well as preparation and approval of the Development Plan.
School Construction & Additions
Academy School District 20
Aspen Valley Middle School - Building Additions and Site Improvements
Liberty High School and Timberview Middle School Building Additions and Site Improvements
The Classical Academy Central Campus New Building and Interior Remodel with Site Grading and Utility Improvements
The Classical Academy North Campus North Sports Field Mapping and Planning
Colorado Springs School District 11
Roy J. Wasson Academic Campus Daycare Area Improvements
Administration Complex Building 1115 N. El Paso Street
Palmer High School - Gym Remodel & Addition Topographic Survey & Utility Design
Palmer High School - Media Center Addition Survey & Design
South Administration Campus - Phase 2 Site Topography, Parking & Drainage
Doherty High School - Topographic Survey & Parking and Drainage Design
Douglas County School District 12
Castle View High School Building Additions and Site Improvements
Denver Public Schools
Valverde Elementary School Mechanical Upgrades Survey and Enclosure addition
Denver School of Science and Technology at Byers Gym Addition and Site Improvements Design with Topographic and Boundary Surveys
Harrison School District 2
Gorman Middle School - Addition, Remodel, Site Modifications
Oak Creek K-5 School - Addition, Remodel, Site Modifications
Falcon School District 49
Falcon Elementary School - Athletic Field Topographic Survey, Grading & Drainage Design, Staking, Construction Observation
Horizon Middle School - Athletic Field Topographic Survey, Grading & Drainage Design, Staking, Construction Observation
Vista Ridge High School Gymnasium & Locker Room Addition with Site Improvements
Colorado Springs Christian Schools
Weber Street Preschool - Topographic survey & Development Plan for Parking Addition
Middle School - Survey, Site & Utility Design, Construction Staking
Weber Street Activity Center - Survey, Site & Utility Design
High School - Survey, Site & Utility Design, Construction Staking
Catholic Diocese of Colorado Springs
Pauline Memorial Catholic School - Addition, Remodel & Site Modifications Phase 1-4
Fountain Valley School of Colorado
School Water System Survey & Design